Office Address

8684 Al-Juhd Al-Mukhlis Street, Al-Andalus Dist. Jeddah, Kingdom of Saudi Arabia 23326

Phone Number

+966 54 348 2001

+966 54 348 2001

Email Address

info@picc-ksa.com

ainasar_123@yahoo.com

Industrial Area II

Desert Technologies (DT – Solar Panel Factory)

  1. Turnkey Project (Civil & MEP)
  2. Design and Drawing (including all required calculations)
  3. Complete civil works including
    1. Gypsum Board Partition
    2. Wall Finishes and Ceiling Finishes
    3. Offices and Meeting Room
    4. Labs and Storage Area
    5. Steel Structure Supports
    6. Steel Structure bases for AC Equipment
  4. Complete Electrical Works
    1. Generators
    2. Electrical Room with MDB Panels and DB Panels
    3. Power Supply for all equipment
    4. Complete ATS System with UPS
    5. Lighting System
    6. Wiring and Wiring Devices
    7. Sound System
  5. Complete Chilled Water Line for equipment
  6. Complete Water Supply for equipment
  7. Exhaust Duct Works for equipment
  8. Vacuum System for equipment
  9. Fire Fighting Works with complete Pump Room
  10. Compressed Air System with Equipment
  11. Air-Conditioning Works for
    1. French Line (Package Unit)
    2. American Line (Package Unit)
    3. Air-Conditioning for all offices (Duct Split)
Industrial Area II

Desert Technologies (DT – Solar Panel Factory)

  1. Turnkey Project (Civil & MEP)
  2. Design and Drawing (including all required calculations)
  3. Complete civil works including
    1. Gypsum Board Partition
    2. Wall Finishes and Ceiling Finishes
    3. Offices and Meeting Room
    4. Labs and Storage Area
    5. Steel Structure Supports
    6. Steel Structure bases for AC Equipment
  4. Complete Electrical Works
    1. Generators
    2. Electrical Room with MDB Panels and DB Panels
    3. Power Supply for all equipment
    4. Complete ATS System with UPS
    5. Lighting System
    6. Wiring and Wiring Devices
    7. Sound System
  5. Complete Chilled Water Line for equipment
  6. Complete Water Supply for equipment
  7. Exhaust Duct Works for equipment
  8. Vacuum System for equipment
  9. Fire Fighting Works with complete Pump Room
  10. Compressed Air System with Equipment
  11. Air-Conditioning Works for
    1. French Line (Package Unit)
    2. American Line (Package Unit)
    3. Air-Conditioning for all offices (Duct Split)
Industrial Area I

Afia Oil International

  1. Supply & Installation of AHU for Chillers Room
  2. Steel Base for New AHU
  3. Custom made Control Panel for AHU
  4. Integration of Chilled Water Lines with Chiller
  5. Power Supply
  6. Testing & Commissioning
Industrial Area III – Chillers & FCU Installation

Afia Oil International

  1. Supply & Installation of YORK Chillers
  2. Supply & Installation of Pump Set for Chillers
  3. Supply & Installation of Control Panels
  4. Supply & Installation of MDB on roof
  5. Power supply
  6. Supply & Installation of BMS (SKADA system)
  7. Programming and integration
  8. Supply & Installation of Exhaust Fans (roof mounted)
  9. Supply & Installation of Dust Particular collection units
  10. Supply & Installation of Sand Trap Louvers
  11. Supply & Installation of FCU for Production, Store and Dispatch Areas and specially for Cold Storage Areas
  12. Steel structure and Steel Bases for all Equipment
  13. Complete network of Chilled Water Pipes
  14. Fiber Glass Insulation / Rubber Insulation
  15. Aluminum Cladding
  16. Water treatment for whole system
  17. Maintain Temperatures for
    1. Production area 180C
    2. Store and Dispatch Area 260C
    3. Cold Storage Airea 50C
Yanbu Industrial Area

NATPET

  1. Supply & Installation of Chillers, AHU, FCU
  2. Including Chilled Water Pipes, Duct Works, Sand Trap Louvers etc.
  3. Tig Welding for all chilled Water Pipes
  4. Fiber Glass Insulation and Aluminum Cladding
  5. Water Treatment for complete system
  6. Installation of complete Pump Room
Head Quarter - Corridor -Ground Floor

Islamic Development Bank

  1. Civil & MEP
  2. Modification and renovation of existing area to new design
  3. Design Drawing / Shop Drawing
  4. Supply & Installation and construction
  5. Electrical Works including Low Current and Access Control
  6. HVAC duct works modification
  7. Plumbing Works including Supply & Installation of Sanitary Fixtures
Building No. 1 - ICD – Ground, First & Second Floor

Islamic Development Bank

  1. Civil & MEP
  2. Modification and renovation of existing area to new design
  3. Design Drawing / Shop Drawing
  4. Supply & Installation & material construction
  5. Electrical Works including Low Current and Access Control
  6. HVAC Works
Building No. 1 - ITFC – 3rd,4th,5th Floor

Islamic Development Bank

  1. Civil & MEP
  2. Modification and renovation of existing area to new design
  3. Design Drawing / Shop Drawing
  4. Supply & Installation and construction
  5. Electrical Works including Low Current and Access Control
  6. HVAC Works
  7. Plumbing Works including Supply & Installation of Sanitary Fixtures
Building No. 2

Islamic Development Bank

  1. Chillers Installation complete setup
  2. Removal of old Chillers and Chilled water pipes
  3. Supply & Installation of Steel Base for new Chillers
  4. Chillers Installation with Chilled water pipes including all necessary valves and accessories
  5. New Pumps Installation
  6. Supply & Installation of New Control Panels
  7. Testing & Commissioning
Building No. 3

Islamic Development Bank

  1. Chillers Installation complete setup
  2. Removal of old Chillers and Chilled water pipes
  3. Supply & Installation of Steel Base for new Chillers
  4. Chillers Installation with Chilled water pipes including all necessary valves and accessories
  5. New Pumps Installation
  6. Supply & Installation of New Control Panels
  7. Testing & Commissioning

Protector & Gamble (PNG)

  1. Supply & Installation of AHU's for new production line
  2. Steel Base of new equipment
  3. Chilled Water line connection from existing network
  4. Supply & Installation of Pump Set
  5. Fiber Glass Insulation and Aluminum Cladding
  6. Supply & Installation of Control Panels
  7. Complete Underground Electrical Works (Power from sub-station)
  8. Testing & Commissioning
  9. Low Current works
Industrial Area I

Saudi Glass

  1. Supply & Installation
  2. Fire Fighting Works for Carton warehouse
  3. Testing & Commissioning
Industrial Area III

CMCC (Can Manufacturing Factory)

  1. Supply & Installation of AHU
  2. Complete duct works for production line
  3. Relocation of 26 Outdoor units (split) complete with new refrigeration pipe line
jeddah

Bassami Building

  1. Supply & Installation of
  2. VRF System
Sulail

Governate Building (3040)

  1. MEP works (supply & installation)
  2. Complete Electrical Works
  3. Full installation of underground cabling
  4. Installation of Electrical Room MDB Panels
  5. ATS System with UPS
  6. Pool/Mast Lights
  7. Lighting Fixtures and accessories
  8. Wiring and Wiring Devices
  9. Installation of Package and AHU
  10. Installation of Concealed Units
  11. Supply & Installation of Duct Works
  12. Complete Fire Fight System
    1. Underground Fire Fighting Pump Room
    2. Fire Hydrants
    3. Fire Sprinklers
  13. Complete drainage system (underground)
  14. Water Supply & Drainage for all toilets
  15. Irrigation System
Najran

Governate Building

  1. MEP works (supply & installation)
  2. Complete Electrical Works
  3. Full installation of underground cabling
  4. Installation of Electrical Room MDB Panels
  5. ATS System with UPS
  6. Pool/Mast Lights
  7. Lighting Fixtures and accessories
  8. Wiring and Wiring Devices
  9. Complete Fire Fight System
    1. Underground Fire Fighting Pump Room
    2. Fire Hydrants
    3. Fire Sprinklers
  10. Complete drainage system (underground)
  11. Water Supply & Drainage for all toilets
  12. Irrigation System
VIP Lounge

King Khalid International Airport – Riyadh

  1. Modification and renovation work including
  2. Airconditioning works
  3. Electrical Works
  4. Plumbing Works
jeddah

Salam Hotel

  1. Supply & Installation of
  2. HVAC equipment with complete duct works
  3. Fire Fighting System with complete Pump Room
jeddah

Solar polyclinics & Day surgery

  1. Turnkey Project
  2. Design & Drawing
  3. Wall Finishes (Decorative, Paint etc,)
  4. Floor Finishes (Tiles, Carpet, Vinyl Flooring)
  5. Ceiling Finishes
  6. Complete mep Works
  7. Generator for emergency backup
  8. ATS System
  9. Complete Fire Fighting Works
  10. Complete Water supply and drainage works
  11. Complete air-conditioning works
  12. Oxygen Supply System for Operation Theaters
  13. Oxygen Supply System for recovery rooms
  14. Sterilization Room
jeddah

Khalil Binladen Villa 4-Duplex villas

Turnkey Project Civil & MEP (full construction)

jeddah

Saud Shahini palace

Turnkey Project Civil & MEP (full construction)